Projango Milestone 3

Klaus Villinger

- New: Generation and export of detailed PDF documentation on all major work items.
- New: Time registration feature on task level including the export of time registration details as PDF on task level.
- New: Calculation of the time worked sums on all work item levels including the export of the time worked sums in the iteration Excel report and all other detailed PDF documents.
- New: Introduction of a new coloring feature for projects, stories and tasks. Story notes and task notes now have a gray default color on the info strip. This default color can be changed on project level.
- New: Introduction of a new version check feature which allows a Projango user to check if the current installation is up-to-date.
- Enhancement: Improved work-flow in case of moving stories between iterations without the need to use the backlog. Moving a story to another iteration can now be executed via the context menu on that story even if the story is actually part of an iteration.
- Enhancement: The copy to backlog feature is now reachable via all story context menus.
- Enhancement: The story menu button on the story line is replaced by the story owner avatar. The menu is still available as context menu on the complete story line.
- Enhancement: Adjusted backlog behavior: Stories without an iteration are now part of the open backlog, only stories "In Progress" will be listed in the active backlog.
- Enhancement: A fast enlarge and shrink feature on notes via a combination of Ctrl-key or Shift-key and a mouse move.
- Enhancement: The priority quick edit is moved to the note number area to avoid misunderstandings in clicking some icons on the icon strip.
- Enhancement: Fast opening of the detailed editor on a note has changed to Ctrl + double click.
- Enhancement: A special red administrator default icon which makes the differentiation to a normal user more visible.
- Enhancement: Improvements on the repository repair system which is now able to list all changes performed.
- Enhancement: Secured report delivery: Only logged in clients are served.
- Enhancement: Projango doesn't enforce a page reload upon communication problems, thus leaving the possibility of a manual copy of data before doing a manual reload.
- Enhancement: Improved stability in case of drag and drop of task notes.
- Enhancement: It is now possible to define a project owner.
- Enhancement: All major state icons are now displayed on the story line if the a non default value is set.
- Enhancement: If the impeded flag is set on a story or task it is now possible to add a impediment description which is displayed as hover text directly on the impeded icon.
- Enhancement: Bookmark-able preselect of the project or iteration which is loaded on the board via the URL parameter projectUId or iterationUId.
- Fix: Several other minor fixes.

Klaus Villinger ist Mitgründer und geschäftsführender Gesellschafter der Xenatec GmbH. Er ist zuständig für die technische Innovation der Xenatec Produkte, die Software-Entwicklung und Produktion und den Kunden-Support der xenatec Produkte. Im Unternehmen betreut er außerdem den Dienstleistungsbereich Bereich IT-Consulting.

Zurück zum Blog

Diese Website verwendet Cookies, um ihre Dienste bereitzustellen und Zugriffe zu analysieren. Durch die Nutzung dieser Website erklären Sie sich mit der Verwendung von Cookies einverstanden. Weiterlesen …